Help to optimize Project WBS
Hi I use it to define my Project WBS (View video)
The script is very similar to each Level, work excelente but and constraint.
let t := this;
let xD := max((select Activities)['Level-1' = t.'Level-1' and 'Level-2' = t.'Level-2'].docID);
if xD = null then docID := 1 else docID := xD + 1 end
There are any way to optimize the formula.
1. The wbs is in the same table Activities