0
Help to optimize Project WBS
Hi I use it to define my Project WBS (View video)
The script is very similar to each Level, work excelente but and constraint.
There are any way to optimize the formula.
1. The wbs is in the same table Activities
1 Antwort
-
For projects, the Work Breakdown Structure (WBS) is the tool that utilizes this technique and is one of the most important project management
Content aside
- Status Answered
- vor 1 JahrTue, November 28, 2023 at 8:50 PM UTCZuletzt aktiv
- 1Antworten
- 35Ansichten
-
1
Folge bereits