Need Help Assign Deliverabkes to WBS
Hi, I design a Engineering Work Breakdown Structure (WBS) for a Project now I need to assign a deliverables to a different levels, but don't know how do that.
Now I have two deliverables as an example
1. Geological Survey #1 I need to assign to WBS level 3 (Geology Engineering)
2. Hydraulic Study #1 I need to assign to WBS level 3 (Hydraulic Engineering)
There Deliverables for many levels of WBS